Job Opportunities API

The Public Ledger of Openings

← Back to the ledger

Sr. Construction Schedule Analyst

BB&E
CompanyBB&E
CategoryConstruction & Trades
LocationKittery
RemoteOn-site (inferred)
EmploymentFull-time
LevelSenior
SalaryNot stated by the employer
Posted14 Jul 2026
Last verified7 Aug 2026
SourceEmployer ATS (workable)
Applications are handled by the employer, not by us.Apply on the employer's site →
Description
BB&E is an employee owned full service civil and environmental engineering and consulting firm, headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members provide Environmental Consulting, Facilities Engineering and Program/Project Management Services to Federal and private sectors.   Position Summary  BB&E is seeking a dynamic and detail-oriented Construction Scheduler to join our team, supporting BB&E’s A&AS contract, assisting NAVFAC Mid-Atlantic, and supporting facilities design and construction projects on-site at Kittery, ME.   Job Duties  Understanding interrelated construction projects within high-visibility Program Initiatives critical to the Navy’s mission. Manage multiple priorities and independently develop technical recommendations or solutions for scheduling issues and time impacts on complex problems encountered during construction contract administration. Presenting technical schedule analysis results (verbal and graphical/tabular) to leadership and non-technical stakeholders, with recommendations for schedule management when requested. Developing and maintaining scheduling training for project teams, including training on network analysis schedules, critical path method, time impact analysis, baseline, progress, and as-built schedule reviews, and software usage. Guiding scheduling specifications for incorporation into project contract documents. Participating in NAVFAC-sponsored Scheduling Working Groups to address lessons learned, propose software changes, and identify training requirements. Supporting the development of schedule software templates for contractors to create baseline schedules. Project delivery methods include both design-bid/build and design-build. Specific Responsibilities Initial Construction Planning: Review the scopes of individual projects and based on actual performance metrics and project conditions, propose:  Recommended provisions for inclusion in contract schedule specifications. Reasonable construction durations to include in the RFP or solicitation. Participate in Technical Evaluation Teams (TET) when selection factors involve contractor schedule and work plan submissions.  Review and provide recommendations to the TET Chair. Review of Baseline Schedules: Review baseline schedules for validity, reasonableness, and depth of construction planning. Ensure compliance with contract schedule specifications. Ongoing Schedule Oversight: Lead the project team in reviewing monthly contractor updates for validity and conformance to contract requirements. Coordinate with technical and non-technical NAVFAC personnel within the Facilities Engineering Command (FEC) and field offices. Work closely with the Contracting Office, design management, estimating, and construction teams to ensure contract changes, non-conformances, and requests for information are accurately reflected in contract schedule updates. Review the critical path and lesser float paths to determine progress concurrency and shared project float. Advise the project team on the disposition of contractor-submitted schedule updates. Alert the project team when the As-Built schedule diverges from the accepted Baseline Schedule. Assist project teams in assessing contractor adherence to the project schedule. Schedule Analysis: Compile Time-Impact-Analysis (TIA) issue files and timelines as issues arise. Review the baseline schedule and schedule updates to determine adherence to the original baseline, apart from identified time impacts. Prepare as-built schedules, including narrative and graphical/tabular visualizations, to highlight delays and/or accelerations that affected timely project completion. Assess the impact of contract changes on the schedule and support the development of the Government's position regarding delays and/